Railworker Repairing Track

Why use our online Mosaic Induction Manager? It’s because we designed it with your needs in mind…

Mosaic Management Systems has focused on the construction sector and for the last decade has designed software for its clients, with their particular needs in mind. We are held in high regard with our clients and users of our products alike. Our innovative approach to problem solving in the construction industries through using cutting edge technology, means we have a great appreciation of the challenges you face daily. As testament to this we are used on a number of high profile projects by the biggest names in the industry. Mosaic Induction Manager provides a refreshing approach to delivering site inductions, that not only saves time, but also raises standards.

Mosaic Induction Manager affords Project Managers more time to get on with Project Management. This is because:

  • Time is saved carrying out inductions onsite
  • Time is saved by reduced form filling
  • Time is saved if online inductions are used
  • Time is saved by limiting repeats of inductions

An easier, faster way to induct your workers

deliver site inductions online or offline or a combination of the two
deliver site inductions online or offline or a combination of the two
Your employees and workforce can easily book themselves onto their preferred slot

Our software offers a much better way to induct personnel over traditional methods like spreadsheets and paper:

  • Consistency is always guaranteed
  • Repeat inductions for those late arrivals can be a thing of the past if run online
  • Diary changes and those who ‘did not show’ is now irrelevant
  • Easy to administer and view status reports
  • Workers can easily be notified about site processes and client health & safety expectations.

User friendly system offering reduced administration time because of:

  • Online record of successful inductions 
  • Online so it is always accessible
  • Cuts down on chasing contractors and own workers to attend inductions

Access from all platforms – PC, tablet or phone

The app allows you to access induction information via Smart Phone

Our individually tailored Online Site Induction process can be used on the go, 24/7 with remote induction using a Smart Phone, Tablet, PC, Laptop.

online site induction

Help with costing your Inductions for construction sites

A study by the Institute for Work & Health (2012) found that the higher risk of work injury among new workers has persisted over the past ten years. This suggests sites need to do more to ensure new workers get the training and supervision they need to stay safe on the job. Ignoring these findings may be cheaper in the short run, but could lead to claims against a company should an accident occur and health & safety has not been explained clearly from the outset.

In addition to monetary implications, there is a productivity argument around providing the correct information to workers so they can hit the ground running on a project. An informed worker will be a more productive worker, particularly when they are finding their feet at the start of a project.

Mosaic operates in the construction sector, where inductions are vital to help and inform new workers coming onto projects and sites. In this environment, having a competent induction program means having compliance with Health and Safety and employment legislation. We have developed an ‘induction calculator’ to help you accurately assessing the cost of pulling together an induction programme. We feel it is time you put a figure on all those administration hours put into getting the right people to the induction class using a paper or spreadsheet system.

Induction calculator

We fervently believe that companies need to develop a detailed induction strategy for sites and projects utilising online software. Plan a comprehensive induction programme and consider what information your new workforce will need to thrive, above and beyond health & safety hazards.

Take a free demo and see for yourself the benefits that our online induction module can bring to your site or project

10 questions you are unlikely to hear a Site Manager ask on a Mosaic project

We take a look at how the deployment of a Mosaic Management System can change site working practices and worker behaviour. Below are ten questions that you would be unlikely to hear from Site Managers, once the Mosaic suite of products is fully operational on site:

Request Demo

1. “Who has actually been inducted?” …I will need to gather all the paperwork together…

Mosaic Induction Manager allows all those participating in the induction process to book themselves onto the class. The induction can then be delivered on-line, off-line or a combination of both depending on client requirements. Once finished the worker is registered against their record as having completing the induction.

Mosaic Induction Manager - Onboarding and Inductions both online and offline
Mosaic Induction Manager – Allowing Inductions options both on-line and off-line

Site Managers can easily run a report to check who has received their induction and therefore is eligible for site access. Paperwork and spreadsheets are no longer necessary, saving considerable administration time.

Watch Video

2. “Is that worker qualified to do that?”… Someone could get hurt here…

Depending upon client requirements, all qualifications can be checked before access to site is

construction worker using dangerous equipmentallowed. Evidence of this is appended to a worker’s record. Each worker is assigned a role, that they must have the right qualifications and experience to perform, before they are issues with their site smart card.

3. “Where is the contractor qualification certificate evidence?”… I cannot find copies…

All certificate and any qualification evidence is scanned and uploaded against a worker record. This can easily be view via a desktop.

No more photocopying of certificates etc., cluttering up site offices.

What makes a safe worker?
What makes a safe worker?

4. “Can I check your CSCS card is in date?”… I am worried about fake cards also… 

As a CSCS IT partner we have access to their database to check worker CSCS cards are in date and not fake. Once checked, workers can continue to use their CSCS on site or alternatively a Mosaic Smartcard can be issued. When the CSCS card expires, an ‘administrator’ is notified, who can inform the worker to get it renewed.

Card security and onsite access to construction site
CSCS cards need to be scrutinised to see if they are in date and also not fake

5. “Do you have a ticket to use this?”…You should also be wearing specific PPE to use this piece of kit…

When a worker is booking out a tool, or piece of plant via the storeroom, Mosaic will flag up if they do not have the right qualifications or skill-set to use it. They can then be denied from taking a piece of equipment that they are not qualified for.

Watch Video

6. “Who on site has not had a start of shift briefing?”…On a busy and complex project such as this, I need to ensure all workers receive this..

All safety briefings and toolbox talks can easily be recorded against worker records. All the worker has to do is present their smart cards to a reader to record attendance.  

Watch Video

7. “I am not 100% sure how long that worker has been on site?”…Fatigue management was a real problem on my last job where some guys were double shifting…

Mosaic Fatigue Risk Manager notifies Supervisors (usually in the form of the project

Without technologies help it is impossible to keep track of your workforce all the time
Without technological help, it is difficult to ensure consistent H&S messages are communicated

administration) of workers who have reached their time limit for their shift. The Supervisor can then act accordingly. This helps prevent double shifting and allows shift patterns to be better managed.

Watch Video

8. “I thought that worker had a site ban in place and was not allowed on here?”…With a site ban in place, I would be open to all sorts of litigation claims should there be an accident…

On a worker’s record ‘site bans’ are recorded and activated. If they still possess a smart card, then this would be flagged up when they try to access the site.

9. “I will need to check when that piece of kit needs an inspection?”…Poorly maintained equipment causes more downtime than we can afford…

Once an asset (which can be tool, small plant, large plant) has been registered on the system, management will be notified when it needs inspection and maintenance.

10. “I am not entirely sure how many workers we have on site at this moment?”…I simply don’t trust the signing in book…

Mosaic Tally, sometimes known as the time and attendance module, means all workers scan onto and off the site using their smart cards. Tally can be set up to work over multiple access points, allowing your workers and contractors alike to be monitored over large geographical areas. This information can easily be retrieved from the system in the form of a report.

Watch Video

Mosaic family of modules

10 construction trends for construction in 2017

10 UK construction industry trends that will make an impact in 2017

We’ve identified 10 key construction industry trends set to shape the market this year. Advancements in technology and an increased focus on sustainability play a vital role here, pushing construction companies to consider different construction methods and technologies that are smarter and greener than ever before.

  1. Smarter buildings

As technology rapidly progresses and becomes more affordable, our buildings are becoming more intelligent. Innovations such as the Internet of Things (IoT), are being incorporated into modern building designs to automate certain functions such as energy and water consumption. This use of technology can improve sustainability, efficiency, safety, personalisation, interactivity, and comfort for those who use the facility.

  1. Prefabricated buildings

Architects are experimenting with the prefabricated building technique and enjoying some surprising results. With new technologies in the construction tool-kit, the modern-day prefabricated home can be built in 24 hours – and built well. This has even reached the attention of the British government as a possible solution to the UK’s housing crisis.

  1. BIM modelling

3D computer designs that use Building Information Modelling (BIM) are the new standard. These drawings provide a truly visual experience that gives the whole picture from every angle. As construction industry trends go, it’s becoming an increasingly popular method to view the architectural designs with the specific building systems in place.

When all potential problems have been addressed before the foundations have been poured, the jobsite will be easier to manage, field coordination will be simpler and construction can be done faster, safer, cheaper and to a higher standard.

  1. Mobile technology for on-site construction management

A construction site that runs like a well-oiled machine will save developers time and money. To help foremen manage their site operations more effectively, mobile-operated, cloud-powered software systems and apps are now available to facilitate easier administration. All field coordination as well as individual people management processes such as timesheets, performance reports and task allocation can be assigned, reviewed, tracked and stored on the go. This means managers can get on with overseeing the critical requirements of the build, rather than getting bogged down in administrative staff management.

  1. Green all the way

‘Green’ buildings use less energy and are thus cheaper to run. This, combined with growing concern for the environment, is driving the trend for more environmentally-friendly buildings. In response, new building regulations have come into effect to harness the power of renewable energy.

The British government aims to have 4 million solar-powered homes up and running by 2020. Renewable energies are gaining ground in the construction industry for good reason: between April and September this year, solar power generated more electricity than coal power.

  1. Labour shortage will continue to plague the industry

The next 12 months will see contractors attempt to stave off uncertainty as they deliver a huge pipeline while battling skills and tech challenges.

  1. Uncertainty over BREXIT

Balfour Beatty has already warned that leaving the EU could increase skills shortages in the UK infrastructure sector – and push up costs. Prolonged uncertainty over the split from the EU could have profound effects on the industry if poorly managed by the government.

  1. Offsite/modular construction will gain a stronger foothold in the market

Offsite construction, also called modular or prefab, isn’t new to the industry. However, experts predict the building method will grow in 2017 as quality, time and labour concerns make alternatives to traditional construction methods more attractive. 

  1. Consolidation

The industry’s cyclical nature, fragmented structure, low margins and project risk make sustained financial resilience challenging. According to Construction News fewer companies, better operating structures and more pricing power will reduce the need to underbid and can break the industry’s vicious cycle. Projects will get larger, and require contractors with the resources and balance sheets to shoulder and manage construction risk, and continue to participate in public-private partnerships. Risk mitigation will become a driver.

  1. Safety

The tragedy at Didcot Power Station was the low point of the year for the industry. Investigations continue and the cause will be probed, but the underlying fact is that fatalities rose in construction last year. Since the recession there has been pressure on companies to turn around losses, but this must not come at the expense of safety. We believe there must be a re-focus on this area in 2017.

Health, the oft-overlooked part of health and safety, will finally become a major industry theme in its own right next year. Various campaigns such as Mates in Mind to promote mental health, being led by the Health in Construction Leadership Group and supported by the British Safety Council, as well as CECA’s Stop. Make a Change campaign that is asking companies to use a stand-down day to discuss issues such as mental health and fatigue.

Mosaic is used by the biggest names in the construction industry to manage a range of safety critical and competency issues on major infrastructure sites and projects.  Indeed, Mosaic is sometimes mandated by companies due to the significant role it plays in reducing site health and safety issues, security, improved productivity and time saved.

To read more about us and the services we offer to the construction industry please click here

Mosaic family of modules

Us survey health and safety

US construction survey reveals lack of technology support for project health and safety issues

In a recent American study, ‘The state of construction management report’ helps appreciate a better biggest challengeunderstanding of what their industry successes, challenges, products, and trends are in 2017. While it should be noted that this is an American study, some parallels can be drawn with the UK’s experience in adopting new technology in this sector. So let’s have a look at what they found out.

Daily reporting was at the top of the list of biggest industry challenges, followed by deadlines and resource management. Supervisors, Subcontractors and General Managers all listed Daily Reporting as one of their main industry challenges indicating a growing concern regarding their ability to keep track of critical information. As you would expect deadlines was up in the top 3 along with the managing of staff. Health and safety came at the bottom of the list.

They asked each stakeholder what their biggest daily challenge was in construction management to gain better insight into what each position in the industry identified as their challenges.

Management:

Finding new business was their main concern by far. Maintaining margins, staff issues and health & safety followed on from this:

business owner

Contractors & sub-contractors:

Resource management significantly lead the way for contractors who see it as their biggest daily challenge. This is followed by staff management and deadlines. Health and safety fell mid-way down the list of priorities for contractors and even further down for sub-contractors.

contractor / subcontractor

Supervisors:

Meeting deadlines is the biggest issue for time-pressured supervisors, followed by health and safety and daily reporting. They work extremely closely with contractors and their own workforce on site and therefore are more likely to be involved with daily health and safety issues. Hence it being further up their list of priorities at number 2.

Supervisor

Technology adoption:

The trend toward adopting technology to improve efficiency is very evident, with the majority of respondents saying they were already using between three and five technology products to support them in this aim. A small percentage of respondents were companies who had really embraced technology, use up to ten technology products on every project. Project management was the main use for technological support, with no mention of Health & Safety in these applications.

snip_20170207123223

However, when asked what the business priorities were, construction management professionals view safety as the top business priority with efficiency as a close second. Gratifyingly, safety is deemed the main priority, thus ensuring that all employees are kept safe during the construction process.

safety priority

While the majority of respondents view their construction management technology solutions as effective to very effective in the final question on the survey, there seems to be a disconnect in terms of technology assisting health and safety on projects – yet all this was cited as a main business objective. This begs the questions, ‘What innovations could be used to address this scant use of applications for safety reasons in the US?’.

Mosaic is used by the biggest names in the construction industry to manage a range of safety critical and competency issues on major infrastructure sites and projects.  Indeed, Mosaic is sometimes mandated by companies due to the significant role it plays in reducing site health and safety issues, security, improved productivity and time saved.

To read more about us and the services we offer to the construction industry please click here

Mosaic family of modules

 

 

 

Source: Vaultnote

dangers on construction sites

Mosaic’s 10 top tips for maintaining a competent workforce on your construction project

Construction sites are notoriously dangerous places to work on if health and safety rules are not respected. That’s why it is all the more important to Request Demoensure the team participates in your company’s safety program, and does all it can to minimise hazards to mitigate site injuries. Here are our top 10 Mosaic tips for reducing accidents and injuries on your construction sites, through maintaining a competent workforce and making safety a priority for your entire team.

What makes a safe worker?
What makes a safe worker on-site – Mosaic’s top 10 tips

Principal contractors obviously have a legally binding duty of care to their workforce, whether they are employees or contractors. It is undoubtedly their responsibility to ensure they have the necessary skills, knowledge, training and experience to do the job safely and without putting their own or others’ health and safety at risk. It is also in their interest to ensure their workforce is both efficient and safety conscious from a profitability and operational perspective. So here are our Mosaic top 10 to support you in achieving this objective.

  1. Set out your health & safety expectations

Planning safety is as critical as executing it. Many contractors have written safety programs. While they may be very comprehensive, the day-to-day implementation of those programs gets back to performance (or non-performance) by the competent person or persons (supervisors / management). Support your staff with intelligent digital systems that eradicate paperwork, freeing them up to better manage staff.

 

  1. Plan your site inductions

The benefits of comprehensive health and safety training in a construction environment are many, providing both benefits for the employer, but more importantly, for the employee. Initially spending a short time discussing health and safety matters during an employee induction is the best first step towards maintaining a low accident rate and keeping lost man hours through sickness and injury to a minimum. Insurance companies look preferably towards employers who take health and safety matters seriously and premium rates will often reflect this.

The CDM regulations require that principal contractors ensure suitable site inductions are provided. They also require that contractors must provide each worker under their control with appropriate supervision, instructions and information so that construction work can be carried out, so far as is reasonably practicable, without risks to health and safety, and that this must include a suitable site induction, where not already provided by the principal contractor.

Construction companies these days have the option to deliver their inductions both on-line and off-line. In our experience, some chose a blended approach of the two. This ensures engagement is really delivered to the workforce twofold, with great effect.

 

  1. Check qualifications and cards

All workers on construction sites must hold the correct qualifications and training for the type of work they carry out. Increasingly so employers need to be confident that if they are shown a card it is legitimate and that the person showing it has the appropriate qualifications to be carrying out their job onsite.

Mosaic Skill Check

 

 

 

  1. Ensure access and exit to the site is checked

We are continually lobbying the industry to carry out electronic card checks as mandatory before allowing workers on site. From a recent CSCS survey half of the workers on their membership said their cards were checked the first time they went on site, but no much thereafter. One in five of those responsible for checking came stated that they came across a fake card. Access also needs to be regulated should a worker have a site bans for one reason or another.

 

  1. Is the worker fit for work?

This is a serious question! Many contractors, suppliers and clients of the industry undertake rigorous and regular measures to tackle this issue including zero tolerance to drugs and alcohol, random testing, providing information on drugs and alcohol through toolbox talks, site inductions and resources such as on-site posters.

Mosaic Occupational Health

 

 

 

  1. Monitor worker fatigue

Construction work involves high-risk activities. To work safely, construction workers must be physically and mentally alert. This means that fatigue is a potential risk. Employers and employees have a responsibility to manage fatigue in the workplace.

Over 3.5 million people in the UK are shift workers, including in the construction industry. There is no specific legislation for shift work but employers are responsible for the health and safety of workers and this includes reducing the risk of fatigue by planning shift work schedules effectively. This, in turn, reduces risks associated with fatigue and can prevent ill health, injuries and/or accidents.

 

  1. Plan regular toolbox talks

To ensure effective toolbox talks, you will need to ensure that all workers participate and are engaged in the toolbox talk.  Knowing and understanding the material delivered is really important too, thus ensuring good delivery. Toolbox talks can be time consuming as just gathering the workforce round to listen someone before the start of day’s work can affect productivity. Hence the aim is to be informal and supervisors can get certain members of the workforce to gather around during their rounds. This also allows for tailored messages to different trade to be delivered.

 

  1. Ensure systems in place for tool allocation, inventory, PPE distribution and asset inspections

Along with proper safety gear, workers should be required to wear reflective vests to reduce the risk of accidents. Ensure these have been distributed to all your employees and contractors alike. In addition correct policing of tools and plant equipment will help reduce theft but also stop workers without correct ‘tickets’ using equipment. A proper system for asset inspection and maintenance should be in place at all times.

 

 

  1. Invest in workforce training

At Mosaic, we understand that simply holding a record of employee qualifications, licences and training courses is insufficient in the current working environment. You need to see your workers develop, lead and improve upon their skillset.

You need piece of mind to know that your workforce can deliver in the way that is safe and productive. By using situational judgement testing you will become more aware and be able to highlight skills and knowledge gaps and expose employee behaviour that may pose a risk to regulatory compliance, best practice, health and safety or even competitiveness in your organisation. 

 

  1. Ongoing delivery development

Don’t just rest on your laurels!

This is an ongoing process that needs to be repeat on every project / site and learnings shared between key colleagues from one project to the next.

Mosaic family of modules

 

 

 

Mosaic is used by the biggest names in the construction industry to manage a range of safety critical and competency issues on major infrastructure sites and projects.  Indeed, Mosaic is sometimes mandated by companies due to the significant role it plays in reducing site health and safety issues, security, improved productivity and time saved.

To read more about us and the services we offer to the construction industry please click here

Tunnel Boring Machine at Lee Tunnel - Thames Tideway Project

Longitudinal health and safety project is a first for UK construction – Thames Tideway project will be used for the fieldwork

Researchers at Loughborough University are embarking on a unique project that will track and inform health and safety leadership, policies, and practices at Tideway.

The project, commissioned by the Institution of Occupational Safety and Health (IOSH), is the first of its kind to study the impact and process of occupational health and safety (OSH) in real time on such a large, multi-site construction programme.

Tideway is the company building the Thames Tideway Tunnel, a major new sewer urgently needed to protect the tidal River Thames from sewage pollution. The 7.2m diameter tunnel, which is due for completion in 2023, is 25km long and runs up to 65m below the River Thames.

Loughborough researchers will be embedded into each of the joint venture teams and will monitor key health and safety processes, personnel, documents, events and activities to provide robust evidence of what does and doesn’t work.

Because of their unique positions within the teams, the researchers will be able to witness how OSH policies and practices intersect with other organisational agendas, and review their effectiveness in real-time. Ultimately, it is intended that findings and best practice will be shared across the wider construction industry and will influence future OSH management and practice.

Project lead Alistair Gibb, Professor of Complex Project Management in Loughborough University’s School of Civil and Building Engineering, said: “This is one of the first studies employing longitudinal research methods on a major infrastructure project of this type, providing an exciting opportunity for researchers to be involved at the very early stages of a major project and follow it through to completion.

“Almost all previous health and safety research comes from a snapshot approach. This project gives us a unique opportunity to monitor OSH within a living lab, and to provide real-time feedback that will enable managers to make changes and improvements – and evaluate their effectiveness – during construction. It promises to provide a completely fresh perspective on the ways in which OSH policies are enacted and implemented. ”

Steve Hails, Director of Health, Safety and Wellbeing at Tideway, said: “Taking part in this hugely important research with Loughborough University is one way we are working towards achieving transformational health, safety and wellbeing standards at Tideway.”

IOSH Head of Information and Intelligence Kate Field said: “IOSH is pleased to be funding this innovative research programme, with the opportunities it presents to examine transformational OSH practices over an extended period. It has the potential to provide new insights into key OSH issues that will be of real value to our members and business.”

We, at Mosaic, are understandably very excited about this piece of research, as our system will be deployed across the 3 joint venture consortium’s building the project. Mosaic will be providing a variety of services across the project over its lifetime:

• Electronic Onboarding / Induction
• Competency Management System
• Safety critical real time skill gap analysis
• Recording of Safety messages / toolbox talks using Smart Cards and Mobile devices
• Access integration for safe movement though zones based on skills
• Perception Assessments – Measures Knowledge vs Confidence to highlight high Risk workers (Situational Based Assessments)
• Fatigue Risk Management Systems
• ‘Network Passport’ embracing all Joint Venture (JV) stakeholders

We wish them well with their research endeavours and look forward to hearing the interim findings. John Micciche, Managing Director of Mosaic said “I am particularly thrilled about this piece of research, as it represents an opportunity to gather robust & statistically significant data on a sizeable project where our system is used as a platform to deliver health & safety excellence.”

To find out more about our involvement in this project click here

CLH and Mosaic working together

Newly privatised oil and pipeline network, requiring that Mosaic on-line reach!

In March 2015, the government announced it had agreed to sell the GPSS (Government Pipeline Storage System) to Compañía Logística de Hidrocarburos
(CLH) for £82m, with CLH taking over operation of the GPSS on 30 April 2015. A contractual agreement between the MoD and CLH ensured military fuel requirements continued to be met using the GPSS.

The efficient operation and maintenance of the Government’s Pipeline and Storage System is crucial to the national interest due to its strong links to the military

Government Pipeline and Storage System pre-privatisation

and economy of the country. The network carries around 40 percent of Britain’s aviation fuel around the country, supplying sites such as Heathrow and Gatwick airports, as well as British and U.S military airbases in England and Scotland.

CLH has already review existing working practices and a schedule of programmed works to ensure that this longstanding and vital UK asset is transformed from a military necessity of the war years into a commercial proposition excelling in efficiency, safety and reliability.

They chose the Mosaic system to help them improve working practices and the health & safety record across this vast network. They virtually use all elements of the Mosaic system from the competency platform with SkillCheck at its core. This is utilised in tandem with the Mosaic Occupational Health module and the Mosaic Induction Manager. Due to the high number of safety critical roles evident across the network, Mosaic Briefing Manager, most notably during Toolbox talks, is used to great effect. Having a robust ‘Competency Management System’ that has bolt-ons, such as Mosaic Briefing Manager, and is delivered on-line is proving a success in this newly privatised operation.

To find out more about us click here

Request Demo

Competency management system in use at Hinkley Point C

Mosaic helps Costain deliver on marine tunnelling project at Hinkley Point C

Costain, one of the UK’s leading engineering solutions providers, is delighted be a major contract partner in the construction of the new Hinkley Point C nuclear power station in Somerset. Costain has started work and will provide the design and delivery of the water cooling systems for the nuclear power station.

Costain will design and construct three marine tunnels, around 11km in total length and each one approximately seven metres in diameter, to take in cooling water from the Severn Estuary for the nuclear reactor before it is cleansed, recycled and returned. They will also be building a jetty at the site.

Mosaic Management Systems will provide an on-line competency management system to support site management on this project. A 500+ strong workforce will be deployed on this phase of the project. Mosaic has been working with Costain now for a number of years, which means data can be migrated across from previous projects that Mosaic has been deployed on. The unique ability of the Mosaic system is that it has a ‘Network Passport’ allowing relevant work details to be transferred across, thus saving considerable time during set up of a new project.

John Micciche MD of Mosaic said “We have worked with Costain on numerous projects now and we are extremely pleased that they have chosen us once again, particularly on such a ground-breaking project.”

To find out more about us click here

Request Demo

Thames Tideway Tunnel - Blackfriars barge launches super sewer construction

Work on Thames Tideway Tunnel commences with Mosaic’s Competency Management System at its core

After years of planning, construction work for the new 25 kilometre interception, storage and transfer tunnel running up to 65 metres below the river, known as the Thames Tideway Tunnel, started at the back end of 2016. Beginning in west London, the main tunnel generally follows the route of the River Thames to Limehouse, where it then continues north-east to Abbey Mills Pumping Station near Stratford. There it will be connected to the Lee Tunnel, which will transfer the sewage to Beckton Sewage Treatment Works. Overflows of untreated sewage into the tidal River Thames add up to tens of millions of tonnes every year. This is unacceptable and the Thames Tideway Tunnel will finally clean up the capital’s river after years of polution.

Thames Tideway Tunnel - the solution in brief

A joint venture between Laing O’Rourke and Ferrovial Agroman has landed the largest Central section drive worth £600m-£900m. The Eastern section of the tunnel has been bagged by a Costain, Vinci and Bachy joint venture and is expected to cost £500m-£800m. Another three-way consortium consisting of Balfour Beatty, BAM Nuttall and Morgan Sindall has picked up the shorter western tunnel drive, which is expected to be worth somewhere between £300m-£500m.

Cross-section of Thames Tideway Tunnel plans
Cross-section of Thames Tideway Tunnel plans

The tunnels will be dug with a gently sloping gradient, falling 1m for every 790m it travels at a depth up to 60m below the

Tunnel Boring Machine at Lee Tunnel - Thames Tideway Project
Tunnel Boring Machine at Lee Tunnel – Thames Tideway Project

surface. Under the present programme, construction is expected to start in 2016 and conclude in 2023. The total Thames Tideway Project is estimated to cost around £4.2bn at 2011 prices. Around £1.4bn of the Thames Tideway Tunnel’s construction cost will be financed by Thames Water and £2.8bn by Thames Tideway Tunnel Ltd.

Mosaic Management Systems is delighted to be involved with such a prestigious engineering project and will be providing a universal system covering all three sections of the build. Certain parts of our system are already in use inducting / onboarding workers and assigning them to the correct job role via our SkillCheck application.  Toolbox talks are being issued and recorded on PDA’s (Personal Digital Assistant) while evidence, such as qualification and CSCS cards, relating to workers is being up loaded via our new Evidence Manager addition.

John Micciche MD of the company commented “We have been working in the Water Sector for a while now and have accumulated a lot of experience in this industry, but it is always great to be involved in such a high profile project”.

To find out more about our work in the Water Sector then please click here